- : 0086-21-61182423
- : 0086-21-61182425
- : [email protected]
- : Room 301,Unit 6,lane 2500,xiupu Road,Kangqiao Industrial Area,Pudong New District,Shanghai
- Improper welding of X80 pipeline may cause cracks
- Brief introduction of API X52 pipeline steel
- The difference between PSL1 and PSL2
- Harm of inclusions in X70 pipeline steel
- API 5L pipeline pipe
- X52 steel plate surface quality standards that need to be met
- The basic production process of API 5L X60 pipeline steel
- The key to Q460D steel welding process
- What does the heat treatment of Q690 Steel include?
- Reasons for choosing Q690D steel
Production process of A53 steel pipe
A53 seamless steel pipe is a material of American standard steel pipe, in which A53-A is equivalent to domestic 10# steel, A53-B is equivalent to domestic 20# steel, and A53-F is equivalent to domestic Q235 material.
The main production process of A53 seamless steel pipe is divided into cold drawing and hot rolling. The main difference between the two is that the production process of cold rolled A53 seamless steel pipe is generally more complicated than that of hot rolling. In appearance, the cold-rolled seamless steel pipe of A53 is shorter than the hot-rolled seamless steel pipe, and rolled A53 seamless steel pipe, the wall thickness of cold-rolled seamless steel pipe is generally smaller than that of hot-rolled seamless steel pipe, but the surface of A53 steel looks brighter. The surface of A53 hot-rolled steel pipe is relatively rough. The main production process is round tube billet → heating → piercing → three-roll cross rolling, continuous rolling or extrusion → tube removal → sizing (or reducing) → cooling → straightening → hydraulic test (or flaw detection) → marking → entering library.