Contact us
- : 0086-21-61182423
- : 0086-21-61182425
- : [email protected]
- : Room 301,Unit 6,lane 2500,xiupu Road,Kangqiao Industrial Area,Pudong New District,Shanghai
HOT News
- Improper welding of X80 pipeline may cause cracks
- Brief introduction of API X52 pipeline steel
- The difference between PSL1 and PSL2
- Harm of inclusions in X70 pipeline steel
- API 5L pipeline pipe
- X52 steel plate surface quality standards that need to be met
- The basic production process of API 5L X60 pipeline steel
- The key to Q460D steel welding process
- What does the heat treatment of Q690 Steel include?
- Reasons for choosing Q690D steel
DNV GL DH32 ship steel production gets new breakthrough in China from January to July 2020
Posted:2020-10-12 14:06:21
From January to July 2020, China's cumulative steel production will exceed 700 million tons, DNV GL DH32 ship steel included.
According to the data of the National Bureau of Statistics, China's DNV GL DH32 ship steel and so on steel production will reach 1204.774 million tons in 2019, with a cumulative increase of 9.8%. As of July 2020, China's DNV GL DH32 ship steel and so on steel production was 116.885 million tons, an increase of 9.9% year-on-year.
The daily DNV GL DH32 ship steel and so on steel production level was 3.7705 million tons / day, a decrease of 2.36% month on month. China's cumulative steel production will reach 723.946 million tons from January to July 2020, with a cumulative increase of 3.7%.
InquiryPlease feel free to give your inquiry in the form below. we will reply you quickly!